CTR group a.s.

BCK3 header en w1030px v03

BUSINESS CENTRE KOŠICE III

 

CONTACT

Andrea Švihrová
tel.: +421 905 505 650
email: svihrova@bck.sk

LOCATION

Between the streets Štůrova and Žižkova
(next to Steel Arena)

mapa
Google map:

ABOUT PROJECT

The multifunctional complex Business Centre Košice III is a continuation of the successful project of Business Centre Košice II, completed in 2010 and now completely leased out.

Both of the projects have been realized by the company VSH development, a member of CTR group implementing developer projects not just in Košice but also in Bratislava, Prague, Dresden and Regensburg.

The BCK III project will be built along Štúrova Street, almost opposite the existing BCK, being connected to it by a covered walkway. Both Business Centres will thus create an architectural landmark and a symbolic entrance gate to the city centre.

BCK III will offer diverse functional uses of the premises, from rental apartments through administrative spaces, supermarket, restaurant to other retail units. Naturally, a sufficient number of parking spaces will be available for the residents and tenants as well as for the clients and customers - the project will provide a total of 430 indoor parking spaces.

BASIC DATA

number of above-ground floors 12
number of underground floors 1
total area of apartments, administration and retail       17.250 m2
total area of administration 6.970 m2
total area of retail 3.100 m2
number of apartments 151
number of indoor parking spaces 430
   
BEGINNING OF THE CONSTRUCTION autumn 2017
COMPLETION OF THE CONSTRUCTION 4.Q 2019

PROJECT BROCHURE

Brochure to download   pdf icon

 


GALLERY

View the embedded image gallery online at:
https://bck.sk/en/bck3#sigFreeId6056ee81b2

CONSTRUCTION PROGRESS

23. 3. 2018 -  The walls and ceiling of the first underground floor are currently being reinforced and the walls of the first above-ground floor are already being built.

View the embedded image gallery online at:
https://bck.sk/en/bck3#sigFreeId49248766a6

8. 2. 2018 -  Layered baseplate + works on underground floors

View the embedded image gallery online at:
https://bck.sk/en/bck3#sigFreeIdd2d67bd216

15. 1. 2018 -  Concreting of underground floors

View the embedded image gallery online at:
https://bck.sk/en/bck3#sigFreeIddcf87088a7

6. 12. 2017 -  Work on the base plate

View the embedded image gallery online at:
https://bck.sk/en/bck3#sigFreeId757fdb7bde

21. 11. 2017 -  Boarding of base

View the embedded image gallery online at:
https://bck.sk/en/bck3#sigFreeId74c12f580b

30. 9. 2017 -  Preparing the construction pit

View the embedded image gallery online at:
https://bck.sk/en/bck3#sigFreeIdce6955b581

5. 6. 2017 -  Demolition of existing building

View the embedded image gallery online at:
https://bck.sk/en/bck3#sigFreeId2d6496a8bb